{"id":2038342,"date":"2020-04-29T12:01:16","date_gmt":"2020-04-29T17:01:16","guid":{"rendered":"https:\/\/live-cs-engineer-magazine.pantheonsite.io\/?p=2038342"},"modified":"2020-04-29T12:01:16","modified_gmt":"2020-04-29T17:01:16","slug":"project-certification-and-closeout-in-a-virtual-covid-world-and-after","status":"publish","type":"post","link":"https:\/\/csengineermag.com\/project-certification-and-closeout-in-a-virtual-covid-world-and-after\/","title":{"rendered":"Project Certification and Closeout in a Virtual COVID World and After"},"content":{"rendered":"<p class=\"p1\">As we experience and emerge from \u201cthe great shutdown\u201d of 2020, things have and will change in all aspects of life \u2013 including the design and construction process. Nowhere in the design and construction interface and transformation has the impact been greater than with respect to on-site design engagement during construction. Designers, contractors, and owners have all had to adapt and create new approaches and protocols to manage communication, satisfy obligations, and keep projects moving.<\/p>\n<p><a href=\"https:\/\/live-cs-engineer-magazine.pantheonsite.io\/wp-content\/uploads\/2020\/04\/Certification-and-Closeout-in-a-Virtual-COVID-World-and-After_4.22.2020.pdf\"><span class=\"td_btn td_btn_lg td_default_btn\">Download the Case Study<\/span><\/a><\/p>\n<p><strong>Sponsored by:<\/strong><\/p>\n<p><a href=\"https:\/\/www.severson.com\/\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-2038337 alignleft\" src=\"https:\/\/live-cs-engineer-magazine.pantheonsite.io\/wp-content\/uploads\/2020\/04\/Dealing-with-Time-is-of-the-Essence_4.22-1024x600.jpg\" alt=\"\" width=\"391\" height=\"229\" srcset=\"https:\/\/csengineermag.com\/wp-content\/uploads\/2020\/04\/Dealing-with-Time-is-of-the-Essence_4.22-1024x600.jpg 1024w, https:\/\/csengineermag.com\/wp-content\/uploads\/2020\/04\/Dealing-with-Time-is-of-the-Essence_4.22-300x176.jpg 300w, https:\/\/csengineermag.com\/wp-content\/uploads\/2020\/04\/Dealing-with-Time-is-of-the-Essence_4.22-768x450.jpg 768w, https:\/\/csengineermag.com\/wp-content\/uploads\/2020\/04\/Dealing-with-Time-is-of-the-Essence_4.22-696x408.jpg 696w, https:\/\/csengineermag.com\/wp-content\/uploads\/2020\/04\/Dealing-with-Time-is-of-the-Essence_4.22-1068x625.jpg 1068w, https:\/\/csengineermag.com\/wp-content\/uploads\/2020\/04\/Dealing-with-Time-is-of-the-Essence_4.22-717x420.jpg 717w, https:\/\/csengineermag.com\/wp-content\/uploads\/2020\/04\/Dealing-with-Time-is-of-the-Essence_4.22.jpg 1117w\" sizes=\"(max-width: 391px) 100vw, 391px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As we experience and emerge from \u201cthe great shutdown\u201d of 2020, things have and will change in all aspects of life \u2013 including the design and construction process. Nowhere in the design and construction interface and transformation has the impact been greater than with respect to on-site design engagement during construction. Designers, contractors, and owners [&hellip;]<\/p>\n","protected":false},"author":4085,"featured_media":2038344,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"","footnotes":""},"categories":[2094,3671],"tags":[18982,12357,18979,14129,17681,18158,17682,3116,18983,18981,18443,18984,10175],"acf":[],"views":15,"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/csengineermag.com\/wp-content\/uploads\/2020\/04\/AdobeStock_309185543.jpeg","_links":{"self":[{"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/posts\/2038342"}],"collection":[{"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/users\/4085"}],"replies":[{"embeddable":true,"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/comments?post=2038342"}],"version-history":[{"count":0,"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/posts\/2038342\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/media\/2038344"}],"wp:attachment":[{"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/media?parent=2038342"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/categories?post=2038342"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/tags?post=2038342"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}