{"id":2074967,"date":"2023-08-29T09:00:00","date_gmt":"2023-08-29T14:00:00","guid":{"rendered":"https:\/\/csengineermag.com\/?p=2074967"},"modified":"2023-08-29T09:00:00","modified_gmt":"2023-08-29T14:00:00","slug":"stv-wins-key-project-to-design-wastewater-treatment-plant-expansion-in-central-texas","status":"publish","type":"post","link":"https:\/\/csengineermag.com\/stv-wins-key-project-to-design-wastewater-treatment-plant-expansion-in-central-texas\/","title":{"rendered":"<strong>STV Wins Key Project to Design Wastewater Treatment Plant Expansion in Central Texas<\/strong>&nbsp;"},"content":{"rendered":"\n<p><strong>KYLE, TX \u2013&nbsp;<\/strong>STV, a professional services firm that plans, designs and manages infrastructure projects across North America, today announced that it has signed a contract with the City of Kyle, Texas, to serve as lead design engineer for the second phase of the city\u2019s Wastewater Treatment Plant (WWTP) expansion. STV\u2019s work will double the plant\u2019s current capacity from 4.5 million gallons per day (MGD) to 9 MGD and incorporate a new total phosphorus limit of 0.5 mg\/L, which is currently being finalized as part of the plant\u2019s permit amendment. The expansion will equip the city to meet the increasing infrastructure needs of its rapidly growing community.&nbsp;&nbsp;<\/p>\n\n\n\n<p>STV will provide a full suite of planning and design services for Kyle\u2019s WWTP, including the development of a nutrient management strategy and the installation of vital equipment that will double the plant\u2019s flow capacity while meeting strict water quality permit limits.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Located approximately 20 miles south of Austin, Kyle is set to become the most populous city in Hays County within the next 10 years. Since 2000, the city\u2019s population has grown more than 800%, from 5,000 residents to more than 50,000 in 2022, according to the city\u2019s census data. When the city\u2019s existing wastewater treatment plant was reaching capacity, Kyle embarked on a major expansion project in 2020 that increased average daily plant capacity from 3.0 MGD to 4.5 MGD. STV provided value engineering and TCEQ permit renewal support. In Phase 2, the firm will lead the necessary improvements to increase flows that can be treated and discharged to 9.0 MGD, doubling the plant\u2019s capacity.&nbsp;<\/p>\n\n\n\n<p>\u201cKyle is a fast-growing city and this project\u2019s swift completion is key to maintaining the city\u2019s service to their community,\u201d said Lindsay Webb, P.E., project manager at STV. \u201cThrough our longstanding relationship with the City of Kyle, STV\u2019s local knowledge and technical expertise is addressing this region\u2019s crucial needs for water and wastewater infrastructure, while helping the community anticipate additional infrastructure expansion needs to create the most efficient plant.\u201d&nbsp;<\/p>\n\n\n\n<p>Since 2017, STV has provided the City of Kyle with design services for roadways and traffic signals, wastewater interceptors and lift station improvements, as well as survey services for the city. The plant expansion is the largest collaboration to-date between the city and STV.&nbsp;<\/p>\n\n\n\n<p>STV has extensive experience with water and wastewater infrastructure in Texas and across the U.S. In Austin, STV served as lead designer for the rehabilitation and improvement of the South Austin Regional Wastewater Treatment Plant, one of the city\u2019s two major municipal treatment facilities. In Dallas, STV converted the<a href=\"https:\/\/stvinc.com\/project\/central-regional-wastewater-system-grit-removal-improvements\" target=\"_blank\" rel=\"noreferrer noopener\">&nbsp;Central Regional Wastewater System\u2019s<\/a>&nbsp;grit removal basins to higher-capacity vortex basins. In San Antonio, STV provided a full suite of design and construction management services for the<a href=\"https:\/\/stvinc.com\/project\/vista-ridge-regional-supply-project\" target=\"_blank\" rel=\"noreferrer noopener\">&nbsp;Vista Ridge Regional Supply Project<\/a>&nbsp;(VRRSP), the largest public-private partnership (P3) water project in North America at the time of its completion. As a result, VRRSP supplies 20 percent more water for the San Antonio region, providing water security and meeting the needs of the rapidly growing community.&nbsp;&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>KYLE, TX \u2013&nbsp;STV, a professional services firm that plans, designs and manages infrastructure projects across North America, today announced that it has signed a contract with the City of Kyle, Texas, to serve as lead design engineer for the second phase of the city\u2019s Wastewater Treatment Plant (WWTP) expansion. STV\u2019s work will double the plant\u2019s [&hellip;]<\/p>\n","protected":false},"author":5017,"featured_media":2074970,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","footnotes":""},"categories":[1853,1854],"tags":[1148,51230,51471,523,412,17163,2559,51472,51473,51474,27055,51475,952,718,51476,9714,22507,795],"acf":[],"views":10,"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/csengineermag.com\/wp-content\/uploads\/2023\/08\/AdobeStock_606526420.jpeg","_links":{"self":[{"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/posts\/2074967"}],"collection":[{"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/users\/5017"}],"replies":[{"embeddable":true,"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/comments?post=2074967"}],"version-history":[{"count":0,"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/posts\/2074967\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/media\/2074970"}],"wp:attachment":[{"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/media?parent=2074967"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/categories?post=2074967"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csengineermag.com\/wp-json\/wp\/v2\/tags?post=2074967"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}